Know the difference between a hazard and a risk, where to look for hazards, how to rate a risk on a 5x5 matrix, the hierarchy of controls from elimination down to PPE, and what goes into a hazard assessment, in about 55 minutes.

  • 55 min
  • Online, on a phone or a computer
  • Professionally narrated
  • Certificate, valid 36 months
Hazard Identification, Assessment and Control covers what every worker, and every supervisor who leads a hazard assessment, should know: the difference between a hazard and a risk, the kinds of hazards, from safety and chemical to biological, ergonomic and psychosocial, where to look for them and how they are found, and why change is a common way for a hazard to get in. It shows how to rate a risk by severity and likelihood on the same 5x5 risk matrix TruStar Connect uses, how to choose controls in the order of the hierarchy, from elimination and substitution through engineering and administrative controls to personal protective equipment, which always comes last, what a hazard assessment holds and who takes part, when it must be done again, and the right to know, to take part and to refuse, with the differences between Canadian jurisdictions shown where they matter. You match hazards to their kinds, find six hazards at a busy loading dock, sort hazards into their bands on the risk matrix, put a re-roofing crew's controls in their place on the hierarchy, find answers in a real-looking hazard assessment for cutting and bevelling pipe, make the calls when the wind picks up and a crane is set up beside a pipe crew, check your understanding after each module, and finish with a 20-question exam. Pass with 80% and your certificate is issued right away, valid for 36 months. Every screen is narrated, with captions and a full transcript. This course provides general training in recognizing hazards, assessing risk and choosing controls. It does not replace your employer's hazard assessments, the site-specific orientation and training you need for your job, or training in a formal risk assessment method.

What you get

  • The course, to take at your own pace. Your place is saved, so you can stop and come back.
  • A TruStar Safety Academy certificate on your training record when you finish.
  • A free TruStar Connect account to keep it in. If your employer uses TruStar Connect, join them and your certificate goes with you.

See inside

What you are paying for

Real screens from the course, the way you will see them on a computer or a phone.

  • Professionally narratedEvery screen is read aloud in a clear, professional voice, with timed captions and a full transcript.
  • Looks great on any devicePhone, tablet or computer. Your place is saved, so you can start on one and finish on another.
  • Hands-on, not slidesFind six hazards at a loading dock, sort hazards on a 5x5 risk matrix, put a roofing crew’s controls in order, find answers in a real-looking hazard assessment and make the calls when the wind picks up, with a check at the end of each module.
The Hazard Identification, Assessment and Control course on a laptop, showing a warehouse loading dock with an unsecured trailer marked as a hazard found, and on a phone, the five places to look for hazards.
Find six hazards at a busy loading dock, and learn the five places to look.
The Hazard Identification, Assessment and Control course on a laptop, showing hazard cards to sort beside a coloured 5x5 risk matrix, and on a phone, the risk matrix with severity along the bottom and likelihood up the side.
Sort hazards into their bands on the same 5x5 risk matrix TruStar Connect uses.
The Hazard Identification, Assessment and Control course on a laptop, showing a windy pipe yard where a pipe hangs from a picker truck with a tag line and a crane is being set up behind, and on a phone, the hierarchy of controls from elimination down to PPE.
Make the calls when the wind picks up beside a pipe crew, and choose controls from the top of the hierarchy down.

Your certificate

A certificate you can print, carry and check

Pass the exam and the certificate is yours at once, as a PDF to print or email, and on your training record in TruStar Connect.

Sample Hazard Identification, Assessment and Control certificate for a learner named Jordan Tremblay
Full certificateLetter size with your name, the course, the date you passed and when it expires. Ready to print or send to an employer.
Front and back of a sample Hazard Identification, Assessment and Control wallet card, with the QR code on the back
Wallet cardPage two of the same PDF. Print it at full size, cut along the marks, fold and laminate it. Its QR code opens your One Card.
A TruStar One Card on a phone, listing a worker's certificates and a QR code
TruStar One CardEvery certificate you hold on one card in your phone, with a QR code a supervisor can scan to see what is current today. Included with every course, even without an employer on TruStar Connect.

Sample shown. Yours carries your own name, dates and certificate number.

No surprises

  • A fresh exam drawn from a bank of 60 questions every attempt, 80% to pass, and the answers you missed shown once it is marked.
  • Valid for 36 months, with the expiry date on the certificate, the wallet card and your One Card.
  • Anyone can check a certificate at connect.trustarsafety.com/verify with its number and the holder's last name.
  • Captions, a full transcript and keyboard controls on every screen, built to WCAG 2.2 AA.
Check a certificate